The objective of the Road
Rehabilitation and Maintenance Program Project for Uruguay
is to improve transport efficiency through rehabilitation
and maintenance of th... Mostrar más +
e national road infrastructure and
enhanced public sector capacity to plan, regulate and
monitor transport and logistics services. The funding level
of the Program is not sufficient to improve, in absolute
terms, the road network condition on the National Road
Network as a whole. In this context, the Program is expected
to ensure that the condition of the National Road Network
remains a given threshold, as reflected in the key results.
Such results are deemed to be the best achievable outcome at
network level when compared not only to the past declining
trend shown but also to counterfactual situation prevailing
in the absence of support to the Program. The Program will
be implemented by: (a) the Road Department of the ministry
of transport and public works, and (b) the Uruguay Road
Corporation. The CVU (Corporacion Vial del Uruguay - Uruguay
Road Corporation) is linked to the MTOP (Ministerio de
Transporte y Obras Publicas - Ministry of Transport and
Public Works) through: (a) a concession agreement, making
CVU responsible for managing part of Uruguay's main
road network, including highway maintenance, rehabilitation,
and, as needed, development; and (b) a technical assistance
agreement, through which DNV provides technical and
administrative support to CVU. The Program is implemented
through contracts to the private sector (road and bridge
rehabilitation, performance-based rehabilitation,
maintenance or performance-based maintenance) or through
routine maintenance works executed by DNV (Direccion
Nacional de Vialidad - Road DepartmenT) directly. Usually,
except for bridge rehabilitation and reconstruction
(design-build contracts), design and supervision functions
required by Program-related activities are carried out by
DNV staff. Mostrar menos -
Fecha: Octubre 12, 2012
Informe#: 70043
Tipo de documento:
Project Appraisal Document!$!540656
Idiomas:
Español
The development objective of Obras
Sanitarias del Estado (OSE) Sustainable and Efficient
Project is to support OSEs adaption to climate change by
increasing the re... Mostrar más +
silience of existing and future water
supply and sanitation systems. The development objective of
the new project is to improve the sustainability of water
services and sanitation of OSE: (i) increasing the
reliability, efficiency and resilience of the water and
sanitation and (ii) strengthening its management capacity.
No major potentially adverse environmental impacts are
anticipated with this project as works will be conducted on
disturbed land where sensitive natural habitats and cultural
resources have not been found. Impacts are considered
site-specific and reversible in nature for which mitigating
measures will be applied. Mostrar menos -
Fecha: Mayo 01, 2012
Informe#: E3011
Tipo de documento:
Environmental Assessment!$!540624
Idiomas:
Español
The development objective of Obras
Sanitarias del Estado (OSE) Sustainable and Efficient
Project is to support OSEs adaption to climate change by
increasing the re... Mostrar más +
silience of existing and future water
supply and sanitation systems. The development objective of
the new project is to improve the sustainability of water
services and sanitation of OSE: (i) increasing the
reliability, efficiency and resilience of the water and
sanitation and (ii) strengthening its management capacity.
For projects requiring the displacement of population, there
is a close relationship between technical stages of the work
and the formulation and implementation of the Resettlement
Plan. This will ensure the availability of land and
resolution of the damages that do not involve acquisition of
property at the time of starting the construction works and
give the time necessary to implement the resettlement plan.
The following describes the relationship between
construction phases and activities of the Plan: potential
impacts will be identified in order to determine the social
feasibility of the work and the main problems faced; the
Plan shall assess the involvement of land and population to
shift the costs of the resettlement plan, including land,
houses, infrastructure basic and necessary equipment, if applicable. Mostrar menos -
Fecha: Marzo 01, 2012
Informe#: RP1289
Tipo de documento:
Resettlement Plan!$!563774
Idiomas:
Español
The Gas Recovery project Montevideo
Landfill falls within the context of the UN Framework
Convention on Climate Change and the Kyoto Protocol, legal
instruments app... Mostrar más +
roved by Uruguay and which is committed to
developing measures aimed at mitigation and adaptation to
climate change. The aim is to reduce the buildup of
greenhouse gases in the atmosphere, through the reduction of
emissions in the landfill of the city of Montevideo. This
project complies with all social and environmental safeguard
policies of the World Bank. However, there are negative
impacts of the project. On the atmosphere, the impact can be
seen as slightly negative, due to the chance of noise and
air pollution caused mainly by the movement of machinery and
vehicles during the installation of project infrastructure
and construction of the plant. The greatest impacts on the
environment, in terms of soil erosion and temporary
modifications of the topography have been previously caused
by the construction and operation of the landfill. The
installation of the infrastructure is what will cause a
greater effect. The visual impact on the landscape is
considered an unfavorable impact of the project in the
construction phase, as in the operation of the landfill.
Most of these negative effects are reversed in due course. Mostrar menos -
Fecha: Noviembre 01, 2011
Informe#: E2894
Tipo de documento:
Environmental Assessment!$!540624
Idiomas:
Español
The objective of the Sustainable
Management of Natural Resources and Climate Change Project
is to support Uruguay's efforts to promote farmer
adoption of improved e... Mostrar más +
nvironmentally sustainable
agricultural and livestock practices that are climate smart.
There are four components to the project. The first
component is Establishment of an Agricultural Information
and Decision Support System (IDSS) to integrate, synthesize,
and generate critical and timely information in relation to
natural resource management, short and medium term climate
forecast, as well as potential long term changes and
impacts. The second component is on farm investments for
'climate-smart' agriculture and livestock
management. This component would be implemented by Ministry
of Livestock, Agriculture and Fisheries (MGAP's) Rural
Development Directorate (DGDR) and would finance carrying
out of demand-driven subprojects consisting of investments
and technical assistance. The third component is to capacity
building and training. This component would finance
activities aimed at strengthening the capacity of (a)
farmers (regardless of their farm size) and technical staff
of advisory service providers to adopt integrated natural
resource and water management practices, and (b) MGAP,
specifically of its Natural Resources Directorate (RENARE),
to implement its natural resources management programs and
climate change strategy in the agricultural sector. The
fourth component is project management and monitoring and
evaluation (M and E). This component would provide the funds
required for (a) supporting the operation of the? Project
Management Unit (PMU) for the efficient coordination and
management of the project; (b) supporting the operation of
the project's M and E system; (c) coordinating and
supervising the implementation of the training activities
described in third component; and (d) supporting the design
and implementation of a communication strategy to
disseminate results and lessons learned within the country
and the region. Mostrar menos -
Fecha: Octubre 17, 2011
Informe#: 62277
Tipo de documento:
Project Appraisal Document!$!540656
Idiomas:
Español
Fecha: Septiembre 15, 2011
Informe#: AC6378
Tipo de documento:
Integrated Safeguards Data Sheet!$!615127
Idiomas:
Español
Fecha: Septiembre 12, 2011
Informe#: AB6250
Tipo de documento:
Project Information Document!$!540659
Idiomas:
Español
Fecha: Septiembre 07, 2011
Informe#: AB6795
Tipo de documento:
Program Information Document!$!810309
Idiomas:
Español
Fecha: Agosto 29, 2011
Informe#: 64395
Tipo de documento:
Project Information Document!$!540659
Idiomas:
Español
Fecha: Agosto 25, 2011
Informe#: 64394
Tipo de documento:
Integrated Safeguards Data Sheet!$!615127
Idiomas:
Español
Fecha: Agosto 04, 2011
Informe#: AC6112
Tipo de documento:
Integrated Safeguards Data Sheet!$!615127
Idiomas:
Español
Fecha: Julio 04, 2011
Informe#: AB6560
Tipo de documento:
Project Information Document!$!540659
Idiomas:
Español
The Sustainable Management of Natural
Resources and Climate Change Project's main objective
is to promote among farmers and rural people to adopt
sustainable integr... Mostrar más +
ated production systems in economic,
social and environmental, within a context of integrated
ecosystem management and natural resources. By incorporating
management measures on soil, water, natural pastures, it
seeks to improve the productivity of rural establishments
integrating biodiversity conservation, tending to reduce the
vulnerability of family farmers to climate variability. In
parallel, it will improve early warning systems, improving
decision-making process and the predictability and risk
management to extreme weather. The development objective of
the project is to make investments in agriculture and
livestock production systems environmentally sustainable and
resilient to climate variability while reducing GHG
emissions from the sector. The objective would be achieved
through developing instruments that would provide critical
and timely information, as well as technical and financial
assistance, to farmers in order to promote investments in
their production systems aimed at reducing risks and making
them more resilient to extreme climatic events. As a sector
project where funding for specific subprojects will be
examined on a case by case basis during implementation, the
environmental impact depends on: i) how each sub-project
will be evaluated for potential environmental consequences
that lead to rejection acceptance, redesign or acceptance
subject to mitigation measures, and ii) the likelihood of an
institutional structure that could implement the
recommendations of the Environmental Assessment. This
project is to generate demand from the productive sector
investment projects. This may mean that a proposal could
create a risk of environmental impact. The project will
contribute to the sustainability of the expansion and
development of the agricultural sector in the medium and
long term upgrading the integrated management of natural
resources through improving the environmental quality of
farms among other things to improve water use, soil and
natural pastures, to increase forest cover with native
species, reduce the use of agrochemicals, improved water
catchment areas and others such as those mentioned in the
preceding paragraphs. Since this is the expected result, it
does not qualify as a project that generates a negative
environmental impact; quite the contrary, at the
environmental level it will have a positive or neutral effect. Mostrar menos -
Fecha: Mayo 01, 2011
Informe#: E2855
Tipo de documento:
Environmental Assessment!$!540624
Idiomas:
Español
The Sustainable Management of Natural
Resources and Climate Change Project's main objective
is to promote among farmers and rural people to adopt
sustainable integr... Mostrar más +
ated production systems in economic,
social and environmental, within a context of integrated
ecosystem management and natural resources. By incorporating
management measures on soil, water, natural pastures, it
seeks to improve the productivity of rural establishments
integrating biodiversity conservation, tending to reduce the
vulnerability of family farmers to climate variability. In
parallel, it will improve early warning systems, improving
decision-making process and the predictability and risk
management to extreme weather. The development objective of
the project is to make investments in agriculture and
livestock production systems environmentally sustainable and
resilient to climate variability while reducing GHG
emissions from the sector. The objective would be achieved
through developing instruments that would provide critical
and timely information, as well as technical and financial
assistance, to farmers in order to promote investments in
their production systems aimed at reducing risks and making
them more resilient to extreme climatic events. As a sector
project where funding for specific subprojects will be
examined on a case by case basis during implementation, the
environmental impact depends on: i) how each sub-project
will be evaluated for potential environmental consequences
that lead to rejection acceptance, redesign or acceptance
subject to mitigation measures, and ii) the likelihood of an
institutional structure that could implement the
recommendations of the Environmental Assessment. This
project is to generate demand from the productive sector
investment projects. This may mean that a proposal could
create a risk of environmental impact. The project will
contribute to the sustainability of the expansion and
development of the agricultural sector in the medium and
long term upgrading the integrated management of natural
resources through improving the environmental quality of
farms among other things to improve water use, soil and
natural pastures, to increase forest cover with native
species, reduce the use of agrochemicals, improved water
catchment areas and others such as those mentioned in the
preceding paragraphs. Since this is the expected result, it
does not qualify as a project that generates a negative
environmental impact; quite the contrary, at the
environmental level it will have a positive or neutral effect. Mostrar menos -
Fecha: Mayo 01, 2011
Informe#: E2855
Tipo de documento:
Environmental Assessment!$!540624
Idiomas:
Español
Fecha: Diciembre 22, 2010
Informe#: AC5832
Tipo de documento:
Integrated Safeguards Data Sheet!$!615127
Idiomas:
Español
Fecha: Noviembre 19, 2010
Informe#: AB6132
Tipo de documento:
Project Information Document!$!540659
Idiomas:
Español
The bank has a long relationship with
Uruguay's agricultural sector, expanding over a period
of more than 60 years in which several projects and various
analytical ... Mostrar más +
and advisory assistance initiatives have been
implemented. The main purposes of the present report are: a)
to analyze the main characteristics of family agriculture as
well as its development potential and constraints; b) to
examine Uruguay's current agricultural policy and
institutional framework; c) present a set of measures aimed
at reducing vulnerabilities and increasing development
opportunities for family producers; and d) contribute to
Ministry of Livestock, Agriculture and Fishery's
(MGAP's) preparation of an agricultural and rural
development plan 2010-15, by presenting a set of policy
recommendations and measures to support an economic and
environmentally sustainable family agriculture development
within the Government's overall strategy to promote
more equitable rural development. Uruguay's
agricultural and food sector has successfully mastered past
crises and retained its role as an important sector of the
national economy, which saw its contribution to Gross
Domestic product (GDP) increased from 6.0 percent during the
economic crisis in 2000-2001 to 9.1 percent of national GDP,
or 13.7 percent including agro-food processing, in 2008. Mostrar menos -
Fecha: Junio 20, 2010
Informe#: 55220
Tipo de documento:
Other Agricultural Study!$!904556
Idiomas:
Español
"El principal objetivo del
Proyecto de Parque Eólico de 10 MW de Uruguay es reducir las
emisiones de gases de efecto invernadero generando
electricidad conectada a ... Mostrar más +
la red a partir de la energía
eólica. La reducción de emisiones se logrará reemplazando la
generación de electricidad basada en combustibles fósiles en
la red nacional. El proyecto contribuirá al desarrollo
sostenible de Uruguay, especialmente mediante la seguridad
energética y la sustitución de importaciones de petróleo
crudo y derivados. Como el proyecto es el primero de su
tipo, está diseñado como un piloto de pequeña escala, con el
objeto de que sea fácilmente repetible en caso de que
resulte satisfactorio. UTE tuvo que mejorar varios tramos de
caminos para lograr el acceso al área del pico más alto en
la que se ubica el parque eólico. Eso generó impactos
transitorios, compensados de manera adecuada, relacionados
con el trabajo de rehabilitación. También se compensó de
manera adecuada el daño permanente sobre cercas y otros
activos, producto de la rehabilitación o la instalación de
postes de transmisión." Mostrar menos -
Fecha: Agosto 20, 2009
Informe#: RP853
Tipo de documento:
Resettlement Plan!$!563774
Idiomas:
Español
"El objetivo principal del
Proyecto de Parque Eólico del Uruguay es reducir las
emisiones de gases de efecto invernadero por medio del uso
de energía eólica. La red... Mostrar más +
ucción de emisiones se logrará
reemplazando la generación de electricidad basada en
combustibles fósiles en la red nacional. El proyecto
contribuirá al desarrollo sostenible del Uruguay. El
proyecto tendrá un impacto positivo en el empleo local
durante la construcción, la operación y el mantenimiento en
una región con desempleo alto. Además, deberá mejorarse la
red de carreteras local, un beneficio indirecto de la
construcción de la planta. Si bien el proyecto está en un
área de praderas en su mayoría originarias (modificadas por
el pastoreo de ganado), no provocará ninguna pérdida ni
degradación significativa de hábitats naturales. Los molinos
de viento y las mejoras en las líneas de transmisión y las
carreteras de acceso tendrán una huella espacial muy
pequeña. Además, no se prevén cambios en el uso local de la
tierra como resultado de los mejoramientos viales, pues el
área del proyecto corresponde a estancias privadas
establecidas hace mucho tiempo, utilizadas para ganadería, y
no hay presiones de colonización por parte de personas
externas. Algunos de los impactos negativos del proyecto
son: riesgo de accidentes por alta velocidad; ruido, polvo y
deterioro de carreteras; generación de residuos y cloacas;
compactación del suelo." Mostrar menos -
Fecha: Junio 01, 2009
Informe#: E2160
Tipo de documento:
Environmental Assessment!$!540624
Idiomas:
Español
"El objetivo principal del
proyecto de parque eólico de Uruguay es reducir las
emisiones de gases de efecto invernadero por medio del uso
de energía eólica. La redu... Mostrar más +
cción de emisiones se producirá a
raíz de la sustitución de la generación de electricidad
basada en combustibles fósiles en la red nacional. El
proyecto contribuirá al desarrollo sostenible de Uruguay.
Tendrá un impacto positivo sobre el empleo local durante la
construcción, el funcionamiento y el mantenimiento en una
zona con alto índice de desempleo. Además, la red local de
carreteras deberá mejorarse, un beneficio indirecto de la
construcción de la planta. Aunque el proyecto se centra en
una zona compuesta principalmente por pastizales autóctonos
(modificados por el pasto de ganado), no provocará ninguna
pérdida ni degradación importante de los hábitats naturales.
Los molinos, la línea de transmisión y las mejoras de las
vías de acceso dejarán una huella espacial muy pequeña. Por
otra parte, no se prevén cambios en el uso de la tierra
local como resultado de la mejora de las vías, ya que el
área del proyecto se extiende a lo largo de fincas privadas
ya establecidas que se utilizan para la cría de ganado y no
hay presiones de colonización por parte de personas ajenas a
estas tierras. Entre los efectos negativos del proyecto, se
incluyen: riesgo de accidentes por alta velocidad; ruido,
polvo y deterioro de las vías; generación de residuos y
aguas residuales; compactación del suelo." Mostrar menos -
Fecha: Enero 01, 2008
Informe#: E2160
Tipo de documento:
Environmental Assessment!$!540624
Idiomas:
Español